Shell & Core: Private Healthcare Facility

This new state-of-the-art healthcare facility offers world-class medical care for a variety of complex conditions and utilises technology to offer modern practices that enhance quality, safety and care for patients. Gratte Brothers was delighted to be involved in this project, delivering the electrical shell and core and fit out services to bring this facility to life.

Project Information

Client:
Private Healthcare Provider
Sector:
Healthcare
Duration:
2.5 Years
Services:
Electrical Shell & Core and Fit Out

Considering the volume of rooms involved in this project and the state-of-the-art nature of this facility, quality had to consistently remain at a high standard during delivery

Our Services

Gratte Brothers Ltd (Building Services & Engineering) was appointed to deliver the electrical shell and core and fit out services to this medical facility, which provides over 150 bedrooms, 29 ITU beds, multiple operating theatres, day case rooms, endoscopy and catheterisation labs as well as full imaging and neurological suites. In order to bring this medical centre to life, Gratte Brothers was required to install photovoltaics and generators on the roof, high-voltage (HV) and low-voltage (LV) switchgear in the basement areas as well as lighting and power.

Specialist lighting, a nurse call system which was linked to the client’s IT network, a clinical uninterrupted power source (UPS), IT systems, general earthing and an addressable fire alarm system were also installed on this project.

The Site

CDP design elements involved the generator, lightning protection, fire alarms, lighting control and the photovoltaics and considering the volume of rooms involved in this project and the state-of-the-art nature of the facility, quality had to consistently remain at a high standard during delivery.

This 5-star private London hospital boasts robotic equipment which can cut strips of tablets into single doses, retains vital information such as expiry dates and also applies barcodes to aid checks required before doses are administered to patients. The facility also importantly, reduces its environmental impact through the production of its own heat and power, whereby reducing carbon emissions traditionally involved in air and water heating. Most of the existing building façade was also maintained and original building entrances reinstated.

Project Logistics

Restricted storage areas on site required all deliveries to be booked in on a ‘just in time’ basis and an off-site consolidation centre was set up to allow bulk orders to be delivered and then called to site as and when required. Commissioning was also a challenge on this project, with the eventual decision taken to commission the system on a floor-by-floor basis to enable the final integrated systems testing to be undertaken in the most expedient way.

This private hospital, located in London, officially opened its doors in early 2022, delivering a brand new outlet for private healthcare in Britain.