
GRIDSERVE Markham Vale
GRIDSERVE's Markham Vale Electric Forecourt is a flagship EV charging destination developed on a regenerated former colliery site near the M1.
As part of the project, Gratte Brothers delivered the site-wide data network infrastructure and integrated security systems that enable secure, reliable and connected operations across the forecourt.


Project Information
- Client:
- GRIDSERVE
- Sector:
- Energy & Utilities
- Duration:
- 24 Months
- Services:
- Site-wide data network infrastructure

Scope of works
Gratte Brothers supplied, installed and commissioned the site-wide data network serving the full forecourt. The package included structured cabling, fibre connectivity and associated hardware, creating the digital backbone for operational systems including access control and CCTV.
The scope included:
- Internal and external Category 6A structured cabling
- Fibre optic connectivity to support resilient, high-speed data transmission
- Installation of associated hardware and containment systems
- Coordination with GRIDSERVE IT Shared Services to ensure technical compliance and effective handover documentation
All works were delivered in line with GRIDSERVE’s health, safety and compliance requirements, with full RAMS, site inductions and quality controls in place.

The Challenge
The key challenge was to deliver resilient, future-ready data networks in a live construction environment. The solution needed to support reliable connected operations without exposing sensitive technical detail, while providing clear handover information for efficient operation from day one.
The site’s external environment also required careful consideration, with external-grade cabling and fibre specified to withstand weather exposure while maintaining performance and compliance standards.

Project Delivery
We focused on delivering a coordinated, high-quality installation that would support long-term operational performance. Through our delivery, we enabled a connected, secure and smarter electric forecourt experience
We established clear technical requirements and operational priorities by engaging with GRIDSERVE stakeholders early on. Installation standards were aligned to GRIDSERVE’s RFP objectives, with strong emphasis on workmanship, cable management, labelling and comprehensive as-built documentation.
By delivering both the physical infrastructure and the technical information needed for ongoing support, the team gave GRIDSERVE greater operational confidence at handover while helping reduce future maintenance risk.
Close coordination with other contractors kept works aligned to the wider programme and supported smooth integration across the site.

Contributing to the decarbonisation of UK transport
The completed network gives GRIDSERVE a resilient, scalable platform for reliable site-wide connectivity, supporting confident day-to-day operation at Markham Vale Electric Forecourt.
For the client, this means stronger operational visibility, smoother facilities management and infrastructure that can support future site requirements. For end users, it helps enable a safer, more reliable and better connected forecourt experience.
The project demonstrates how robust digital infrastructure can add long-term value without disclosing sensitive technical detail, enabling smart, secure and sustainable EV destinations while supporting the regeneration of former industrial land.


