Holy Trinity Church

The Cadogan family has maintained a property portfolio in London's Chelsea for over 300 years, which includes the Holy Trinity Church. Inadequacies in the existing heating system meant Gratte Brothers Building Services & Engineering (GBL) was commissioned to conduct a feasibility study into a replacement system, before being awarded the contract to fit the system.

Project Information

Client:
Parochial Church Council
Main Contractor:
Gratte Brothers Limited
Sector:
Other
Duration:
3 Months
Services:
Mechanical Installation

Gratte Brothers proposed several solutions, and a full 3D survey of the building was conducted. This installation was undertaken whilst the building was a functioning place of worship

The Cadogan family has maintained a property portfolio in London’s Chelsea for over 300 years. The Estate presides over a glittering collection of important period architecture which includes the Holy Trinity Church, just off Sloane Square.

Maintenance revealed that the existing heating system was not only inadequate for the lofty interior of the church but was also dehydrating the structure’s timber. This was of particular concern to the engineers due to replace the church organ.

Gratte Brothers was commissioned to conduct a feasibility study into a replacement system, and so a full 3D survey of the building was conducted.

Back To Projects