Gatwick South Terminal Boiler Decentralisation

London Gatwick's South Terminal was opened in 1958 and covers an area of 160,000m2. Gratte Brothers Building Services & Engineering (GBL) was appointed Principal Contractor to undertake the mechanical installation of 2 new modular boilers in the Eastern and Northern Plant rooms located on the roof of this operational terminal over a 10-month programme.

Project Information

Client:
Gatwick Airport Ltd
Main Contractor:
Gratte Brothers Limited
Sector:
Transport
Duration:
10 Months
Services:
Mechanical Installation

Valves and pressure gauges were installed at low level on the new distribution pipework serving the existing AHU’s to facilitate access and maintenance

Since commercial operations commenced in the 1930’s Gatwick Airport has grown to become the UK’s second largest airport with the North and South Terminals serving over 45 million passengers on 280,000 flights from 143 aircraft stands.

The South Terminal was opened in 1958 and covers an area of 160,000m2. Gratte Brothers was appointed Principal Contractor to undertake the Installation of 2 new modular boilers in the Eastern and North Plant rooms located on the roof of this operational terminal over a 10 month programme.

Works included the replacement of the existing High Temperature Hot Water (HTHW) system pipework with new Low Temperature Hot Water pipework, to connect to the newly installed modular gas fired boilers and controls.

Back To Projects