Electrical Infrastructure Upgrade: Data Centre
Comprising the addition of 2 new power rooms and associated electrical infrastructure, Gratte Brothers Building Services & Engineering (GBL) was appointed Principal Contractor to facilitate an increase of 1.5MW capacity within this existing live data centre, including the redevelopment of fallow space.


Project Information
- Client:
- Global Digital Infrastructure Company
- Main Contractor:
- Gratte Brothers Ltd
- Sector:
- Data Centre
- Duration:
- 1 Year
- Services:
- Principal Contracting, Electrical Infrastructure & IT Networking Services
A particular challenge for all parties was the live nature of the site environment and the critical services which needed to remain online at all times without disruption to the client’s operations

Engineering & Construction
The project consisted of the fit-out of switch rooms, the removal and storage of an existing generator and the installation of client supplied step-down transformers, 11kV switchgear, LV switchgear, standby generator, uninterrupted power supply (UPS) and power distribution units (PDU). Also included within this fit out was supervisory control and data acquisition (SCADA), a hybrid dry air cooler, water cooled chiller, computer room air conditioning (CRAC) units, chiller water packaged plant room and building management system (BMS) packaged plant rooms.
Construction elements managed by Gratte Brothers during the build included associated builders work such as white walls, structural steelwork, raised flooring, bunding, epoxy resin floor finishes and steelwork ramp, along with the strip out, enabling package and fit out of new technical plant rooms and associated facilities.

IT Network Services
Also involved in this project was Gratte Brothers Security Systems & Software, appointed to install the integrated network system required to facilitate Wi-Fi, monitoring of generator controls and other critical services. A particular challenge on this project was the programming and sequencing of work to ensure that the network was installed and online first in order to allow other services to be fully installed, tested and commissioned.
A particular challenge for all parties was the live nature of the site environment and the critical services which needed to remain online at all time without disruption to the client’s operations.